> SolidWorks Costing > Machining Costing > Moving Machining Setup Costs to Different Setup Operations
Introduction
Administration
User Interface
SolidWorks Fundamentals
Moving from 2D to 3D
Assemblies
CircuitWorks
Configurations
SolidWorks Costing
SolidWorks Costing Overview
How Costing Works
Sheet Metal Costing
Machining Costing
Evaluating the Cost of a Machined Part
Machining Costing Task Pane
Machining CostingManager
Machining Templates
Custom Operations for Machined Parts
Editing Machining Operations
Moving Machining Setup Costs to Different Setup Operations
Applying Cost Overrides
Moving Operations to the No Cost Assigned Folder
Creating Reports
Adding Costing Information to File Properties
Removing Costing Information from Parts
Troubleshooting
Design Checker
Design Studies in SolidWorks
Drawings and Detailing
DFMXpress
DriveWorksXpress
FloXpress
Import and Export
Large Scale Design
Model Display
Mold Design
Motion Studies
Parts and Features
Routing
Sheet Metal
Simulation
SimulationXpress
Sketching
Sustainability Products
SolidWorks Utilities
Tolerancing
Toolbox
Weldments
Workgroup PDM
Troubleshooting
Glossary
Hide Table of Contents Show Table of Contents

Moving Machining Setup Costs to Different Setup Operations

The machining Costing tool assumes that when the direction of an operation is different from other operations (such as drilling a hole on a different face), that it requires the part to be repositioned and incurs a separate setup operation. However, if you manufacture the part in a multi-axis machine and the machine rotates the part to run the operation, a new setup is not necessary. Therefore, you can move the separate setup cost into a previous setup operation.

  1. In the CostingManager, right-click a setup cost Costing_Setup_Cost.gif and click Move To.
  2. Click a setup operation.

    In the Setup FM_folder.gif folder, the setup cost moves to the operation you selected.

    Alternatively, you can drag and drop individual setup costs Costing_Setup_Cost.gif to different setup operations setup_operation_folder.gif in the Setup FM_folder.gif folder.



Related SolidWorks Forum Content

Provide feedback on this topic

SolidWorks welcomes your feedback concerning the presentation, accuracy, and thoroughness of the documentation. Use the form below to send your comments and suggestions about this topic directly to our documentation team. The documentation team cannot answer technical support questions. Click here for information about technical support.

* Required

 
*Email:  
Subject:   Feedback on Help Topics
Page:   Moving Machining Setup Costs to Different Setup Operations
*Comment:  
x

We have detected you are using a browser version older than Internet Explorer 7. For optimized display, we suggest upgrading your browser to Internet Explorer 7 or newer.

 Never show this message again
x

Web Help Content Version: SolidWorks 2012 SP05

The search functionality within the web help is in a beta test phase and you may experience periodic delays or interruptions in its performance. These are the normal and ordinary features of a beta test and shall not under any circumstances give rise to any liability on the part of DS SolidWorks or its licensors. The topics within the Web-based help are not beta topics; they document SolidWorks 2012 SP05.