Use the EDMD Report dialog box to view the history of changes to an EDMD board.
To open the EDMD Report dialog box, in the Changes pane, right-click the baseline or a change and click Show Report.
History
Messages
|
Displays the baseline and changes that appear in the Changes pane. |
Change File
|
Displays the names of the baseline and change files. |
Response File
|
Displays the names of response files received from the PCB designer. |
Change ID
|
Displays the change ID assigned to the change file.
|
Change Description |
Shows change details. For example, if an item is moved in SOLIDWORKS, the Change Description says ITEM MOVED and gives the coordinates of the item.
|
Change By |
Displays the name of the person who made the change. |
Response By |
Displays the name of a PCB designer who responds to the change. |
Change Date |
Displays the date the change was made. |
Response Date |
Displays the date the PCB designer responded to the change. |
Status |
Indicates whether the change is:
- Proposed
- Accepted
- Rejected
|
Built in SW |
Indicates whether the EDMD file has been built in SOLIDWORKS. |
Change Note |
Displays change notes created in the Sync with ECAD dialog box. |
Response Note |
Displays response notes provided by the PCB designer. |
Export to CSV
Lets you save the report contents as a comma-separated value file by opening the Save As dialog box for the .csv file type.
You can open the saved file in an Excel spreadsheet.