You can display a tree- or text-based status report for the assembly that you are building from a P&ID file. You can print or copy the text-based report.
To open the P&ID Validation Report dialog box, from the Piping and Instrumentation tab, click Report.
To access the
Piping and Instrumentation tab:
- Create and save a new assembly without closing it, or open an existing assembly.
- From the Task Pane, select the Piping and Instrumentation
tab.