Use the Machine screen in the Costing Template Editor to define the machines and costs associated with machining operations.
To display this screen:
- In the Costing Template Editor, click Machine.
You can copy and paste numerical data in the Costing Template Editor.
Machines |
Sets the name of the machine. |
Mill, Turn, and Drill |
Sets the machine as a milling, turning, or drilling machine. |
Machine Cost |
Sets a cost per hour to use the machine. |
Labor Cost |
Sets a cost per hour for an operator to use the machine. |
Max RPM (rev/min) |
Sets a value to be used when the calculated RPM is greater than the maximum RPM for material removal rate (MRR) calculations. |