Hide Table of Contents

Migrating from Partial to Complete Toolbox Integration

If you are using partial Toolbox integration, where the master library is outside the vault but part files also exist in the vault, consolidate the library in the vault before installing or upgrading SOLIDWORKS and configuring the SOLIDWORKS integration.

When the same files exist both outside and inside the vault, the procedure you use depends on where the newer files are located. Typically, files in the vault are newer. Files outside the vault might be newer if some users are working with the shared Toolbox library but are not using Enterprise PDM to manage their designs.

To migrate to complete Toolbox integration:

  1. If files outside the vault are newer than those in the vault (not typical), check out the entire Toolbox.
  2. Copy the Toolbox root folder that is outside the vault into the vault.

    If the same files exist both outside and inside the vault, you are prompted to overwrite the vault files. If your vault files are newer (typical), choose not to overwrite vault files. If files outside the vault are newer, choose to overwrite vault files.

  3. Check in the Toolbox vault folder.

    The vault now contains the latest versions of all Toolbox parts.

  4. Rename or move the old shared Toolbox (outside the vault) so that it is not accessible to users.

    If you plan to delete the old shared Toolbox, back it up first.

  5. Upgrade SOLIDWORKS and Enterprise PDM to 2010 or later as described in Upgrading to Manager Toolbox Entirely in the Vault.
  6. Configure Toolbox as described in Configuring Toolbox in Enterprise PDM and SOLIDWORKS.

    Select Manage SOLIDWORKS Toolbox in the vault and Search subfolders for Toolbox parts on assembly check-in when you configure Toolbox.

  7. Complete the steps in Post-Migration Instructions for Toolbox Users.


Provide feedback on this topic

SOLIDWORKS welcomes your feedback concerning the presentation, accuracy, and thoroughness of the documentation. Use the form below to send your comments and suggestions about this topic directly to our documentation team. The documentation team cannot answer technical support questions. Click here for information about technical support.

* Required

 
*Email:  
Subject:   Feedback on Help Topics
Page:   Migrating from Partial to Complete Toolbox Integration
*Comment:  
*   I acknowledge I have read and I hereby accept the privacy policy under which my Personal Data will be used by Dassault Systèmes

Print Topic

Select the scope of content to print:

x

We have detected you are using a browser version older than Internet Explorer 7. For optimized display, we suggest upgrading your browser to Internet Explorer 7 or newer.

 Never show this message again
x

Web Help Content Version: SOLIDWORKS PDM 2014 SP05

To disable Web help from within SOLIDWORKS and use local help instead, click Help > Use SOLIDWORKS Web Help.

To report problems encountered with the Web help interface and search, contact your local support representative. To provide feedback on individual help topics, use the “Feedback on this topic” link on the individual topic page.