If you receive a revised drawing for a
previously-created
inspection project, you can replace the existing drawing in the project. Then you can
capture the incremental changes between the drawings and export the project to a new
ballooned PDF and inspection report.
You can only replace an entire drawing, not individual characteristics.
To replace
drawings:
-
In the
existing project, click Replace Drawing
(Document ribbon).
-
In the dialog box, open the revised drawing.
-
Click Yes or No to
choose whether
to compare the revised drawing to the existing drawing.
If you click
Yes,
the drawings are compared, and you need to click
in the
Properties/Preferences
PropertyManager to replace the drawing. If you click
No, the drawing is replaced.