Generating Report Drawings

You can generate or update report drawings.

Do one of the following:
  • Report management: Generate drawings .
  • Right-click a book or folder and click Draw reports here or Draw design rules here.

The reports are generated at the book level. If the project contains folders, click ... on the right side of the report and select the preferred destination folder (multiselection is available).

Select the boxes next to the reports you want to generate and click OK to create the reports.

The following options appear:
Option Description
Select configurations Opens a dialog box to let you manage which reports are generated as drawings.
All reports of the project Generates all project reports drawings.
Update selected reports Updates the drawings. This option is active when the book or folder already contains reports.

According to the electrical project configuration settings, report drawings are updated when you start certain actions, such as printing, exporting, revision, or project archiving.