Use the Machine screen in the Costing Template Editor to define the machines and costs associated with machining operations.
To display this screen:
- In the Costing Template Editor, click Machine.
You can copy and paste numerical data in the Costing Template Editor.
Machining
| Machines |
Sets the name of the machine. |
| Mill, Turn, and Drill |
Sets the machine as a milling, turning, or drilling machine. |
| Machine Cost |
Sets a cost per hour to use the machine. |
| Labor Cost |
Sets a cost per hour for an operator to use the machine. |
| Max RPM (rev/min) |
Sets a value to be used when the calculated RPM is greater than the maximum RPM for material removal rate (MRR) calculations. The MRR equation displayed in the templates is a base equation. Some manufacturing processes require additional values to determine the total MRR. As a result, the calculated MRR value might not match the value shown equation in all calculations, depending on the manufacturing processes assigned in the template.
|
| Load/Unload Time |
Specifies the time it takes to load a part into a machine and then unload it for each setup operation. |
| Operation Setup Time |
Specifies the time it takes to set up fixtures and other machining process setup operations. |
| Setup Distribution |
Specifies options for applying the operation setup time to costing:
|
Applied Once Per Part
|
|
|
Divided Over Total Quantity
|
|
|
Divided Over Lot Size
|
|
|
Cutting
| Default |
Sets the default cutting machine for operations such as waterjet, plasma cutting, and laser cutting. |
| Machines |
Sets the name of the machine. |
| Machine Cost |
Sets a cost per hour to use the machine. |
| Labor Cost |
Sets a cost per hour for an operator to use the machine. |
| Load/Unload Time |
Specifies the time it takes to load a part into a machine and then unload it for each setup operation. |
| Operation Setup Time |
Specifies the time it takes to set up fixtures and other machining process setup operations. |
| Setup Distribution |
Specifies options for applying the operation setup time to costing:
|
Applied Once Per Part
|
|
|
Divided Over Total Quantity
|
|
|
Divided Over Lot Size
|
|
|
End Cutting
| Default |
Sets the default end cutting machine for weldment cut off operations. |
| Machines |
Sets the name of the machine. |
| Machine Cost |
Sets a cost per hour to use the machine. |
| Labor Cost |
Sets a cost per hour for an operator to use the machine. |
| Load/Unload Time |
Specifies the time it takes to load a part into a machine and then unload it for each setup operation. |
| Operation Setup Time |
Specifies the time it takes to set up fixtures and other machining process setup operations. |
| Setup Distribution |
Specifies options for applying the operation setup time to costing:
|
Applied Once Per Part
|
|
|
Divided Over Total Quantity
|
|
|
Divided Over Lot Size
|
|
|
Plastic Injection Molding
| Default |
Sets the default molding machine. |
| Machines |
Sets the name of the machine. |
| Machine Cost |
Sets a cost per hour to use the machine. |
| Labor Cost |
Sets a cost per hour for an operator to use the machine. |
| Load/Unload Time |
Specifies the time it takes to load a part into a machine and then unload it for each setup operation. |
| Operation Setup Time |
Specifies the time it takes to set up fixtures and other machining process setup operations. |
| Setup Distribution |
Specifies options for applying the operation setup time to costing:
|
Applied Once Per Part
|
|
|
Divided Over Total Quantity
|
|
|
Divided Over Lot Size
|
|
|
Die Cast Molding
| Default |
Sets the default molding machine. |
| Machines |
Sets the name of the machine. |
| Machine Cost |
Sets a cost per hour to use the machine. |
| Labor Cost |
Sets a cost per hour for an operator to use the machine. |
| Load/Unload Time |
Specifies the time it takes to load a part into a machine and then unload it for each setup operation. |
| Operation Setup Time |
Specifies the time it takes to set up fixtures and other machining process setup operations. |
| Setup Distribution |
Specifies options for applying the operation setup time to costing:
|
Applied Once Per Part
|
|
|
Divided Over Total Quantity
|
|
|
Divided Over Lot Size
|
|
|
3D Printing
| Default |
Sets the default 3D printer. |
| Machines |
Sets the name of the machine. |
| Printer X |
|
| Printer Y |
|
| Printer Z |
|
| Feed Rate |
|
| Layer Height |
|
| Machine Cost |
Sets a cost per hour to use the machine. |
| Labor Cost |
Sets a cost per hour for an operator to use the machine. |
| Load/Unload Time |
Specifies the time it takes to load a part into a machine and then unload it for each setup operation. |
| Operation Setup Time |
Specifies the time it takes to set up fixtures and other machining process setup operations. |
| Setup Distribution |
Specifies options for applying the operation setup time to costing:
|
Applied Once Per Part
|
|
|
Divided Over Total Quantity
|
|
|
Divided Over Lot Size
|
|
|