You can add or modify custom properties in SOLIDWORKS
documents.
To specify custom properties to add or modify:
-
Click in the first row in the Name column.
-
Select an existing custom property name from the list, or enter
a name.
Material, Weight, DrawnDate, MakeOrBuy, and CompanyName are examples of custom property names that are
predefined in SOLIDWORKS documents.
In a SOLIDWORKS part, assembly, or drawing document, click
to see the list of custom property names for that document.
See Summary Info - Custom and Configuration Specific for more information on
working with custom properties in SOLIDWORKS documents.
-
Press Tab to move to the Type column, and select a custom property type (Text,
Date,
Number,
Yes or no).
-
Press Tab to move to the
Value column, and enter a custom
property value.
Type |
Value |
Text |
Enter text. |
Date |
Enter a date in the
mm/dd/yyyy format. |
Number |
Enter a numerical value.
|
Yes or no |
Enter yes or no (not case sensitive).
|
-
Press Tab to move to the
Configuration column. If the custom
property that you add or modify affects configurations within the SOLIDWORKS
document, enter the configuration name. Otherwise, leave blank.
-
Click in the next row in the Name column, and repeat steps 2 through 5 for each custom
property that you add or modify.
-
Click Finish.
The task and its title, scheduled time, scheduled date, and status
appear in the
Tasks panel. The status of
the task is
Scheduled.
To run a scheduled task, your computer must be on at the scheduled start
time. The SOLIDWORKS Task Scheduler
window does not need to be open. If your computer is off at the
scheduled start time, the task runs when you turn your computer on.
At the scheduled start time, the task is initiated. If
the task acts on more than one file, a subtask is generated for each
file. If you selected Backup task
files in Task
Options, a backup copy of each file is saved to a
.zip file. Then the custom
properties in each file are updated. When the task completes, the status
changes to Completed.
If your backup files include Unicode file paths, use an extraction
application for zip files that supports UTF-8 encoding.
-
After the task completes, click Completed to see the SOLIDWORKS Task Scheduler Report.