Visualize Boost has
undergone a significant redesign, introducing enhanced capabilities tailored for
managing SOLIDWORKS Visualize render tasks across multiple machines.
With a simplified and intuitive setup
process, configuring render jobs across a network is more efficient than
ever.
The latest iteration of Visualize Boost boasts a user-friendly setup interface,
streamlined machine discovery, and heightened
stability.
To install and set up Visualize
Boost:
- Use the SOLIDWORKS Installation Manager to install Boost on one or multiple
machines that are accessible in the network.
- On each Boost machine, do the following:
- Start SOLIDWORKS Visualize Boost 2025.
- Go to .
- For one machine, select Coordinator
to make it the coordinator node. Leave the Coordinator
check
box
clear for all other Boost nodes.
- For non-coordinator Boost nodes, enter the Coordinator IP
Address.
- Click Apply.
- ln SOLIDWORKS Visualize, go to ,
and enter the Coordinator IP Address.
- Click Connect.
Once connected, you can choose the Boost Renderer in the Render Wizard/Quality page
to start a render that is distributed over the network.