To include scrap material in the cost of a sheet metal part, you can designate a percentage of the part as scrap.
To designate a portion of a sheet metal part as scrap:
- Click Costing (Tools toolbar or the Evaluate tab on the CommandManager) or .
- In the Costing Task Pane, under Blank Size, type a percentage value for Percent scrap.
The value you type for Percent scrap designates a portion of the material defined in your Area to cost selection as scrap material.