Now route the pipe from the tee fitting to the upper flange. First you need to add the flange to the route.
-
Zoom to the upper flange.
- Move the pointer over the connection point (CPoint1) in the center of the flange.
The pointer changes to

and the connection point is highlighted.
- Right-click CPoint1 and select Add to Route.
A stub of pipe extends from the flange.
